The following information is provided by EnergyNet. All inquiries on the following listings should be directed to EnergyNet. Hart Energy is not a brokerage firm and does not endorse or facilitate any transactions.
Ascent Resources- Utica LLC and Ascent Utica Minerals LLC has retained EnergyNet for the sale of a non-operated 96 well package in Belmont, Guernsey, Harrison, Jefferson and Noble counties, Ohio. The lot# 114740 package includes a 12- month average net income of $32,114 per month.
Opportunity highlights:
- Non-Operated Working Interest in 96 Hz Wells:
- 1.75% WI / Avg NRI ~1.58%
- Wellbore Only
- 12-Month Average Net Income: $32,114/Month
- 6-Month Average 8/8ths Production: 56,489 MCFPD and 169 BOPD
- 6-Month Average Net Production: 881 MCFPD and 3 BOPD
Operator: Ascent Resources - Utica, LLC
Bids are due March 14 at 4 p.m. CDT. For complete due diligence, please visit energynet.com, or email Emily McGinley, managing director, at Emily.McGinley@energynet.com, or Jessica Scott, buyer relations, at Jessica.Scott@energynet.com.
Recommended Reading
US Hits China with Huge Tariff Hikes on Solar Cells, EVs, Batteries
2024-05-14 - The directive quadruples the tariff rate on electric vehicles from 25% to 100%, and the tariff rate for solar cells doubles to 50%.
US Republican Attorneys General Sue to Stop EPA's Carbon Rule
2024-05-09 - The rule, finalized by President Joe Biden's administration last month as part of an effort to combat climate change, was challenged in three lawsuits filed in the U.S. Court of Appeals for the District of Columbia Circuit.
Analyst: Exxon Mobil, Pioneer Deal Close Likely ‘Imminent’
2024-05-01 - With approval from the Federal Trade Commission, Exxon Mobil could close its $59.5 million acquisition of Pioneer Natural Resources after more than six months of review.
Oil, Gas Production Fee Set to Hit Colorado Producers
2024-05-01 - The deal reached this week will eliminate several proposed ballot measures targeting the fossil fuel industry ahead of this year's election, including one that would have halted drilling in summer months.