Text Size:
A | A

EE3 Completes Record Niobrara Horizontal Well

Text Size: A | A
October 15, 2013

EE3 LLC reported the highest 24-hour initial production rate of a horizontal Niobrara well drilled in the North Park Basin, the company said in a press release Oct. 14.

The Hebron #3-12H flowed 1,054 barrels of oil in a 24-hour test period, with 400 pounds per square inch flowing casing pressure on a 48/64th-inch choke. The well was drilled to 6,388 vertical feet before being completed with a 4,100 foot lateral in the Niobrara D bench. The well was completed with 19 stages of the plug and perforation process using a total of 3.9 million pounds of sand.

The Hebron #3-12H is located in Section 12, Township 7 North, Range 81 West of Jackson County, Colo., in the center part of the North Park Basin. EE3 LLC holds a 100% working interest in the well.

EE3 LLC is an independent oil and gas exploration and production company headquartered in Boulder, Colo.

EE3 LLC

Related Articles

Chesapeake, RKI Swap Powder River Basin Acres

In addition to the exchange of acreage, Chesapeake will pay RKI $450 million in cash. 

Colorado City’s Fracking Ban Thrown Out As Statewide Vote Looms

Five communities in the state have voted to ban or put a moratorium on fracking.