Trillion Energy announced the start of their revitalization project for the South Akcakoca Sub-Basin (SASB) gas field in the Southwestern Black Sea.
A total of 49 m of new gas pay will be perforated in Guluc-2, South Akcakoca-2, West Akcakoca-1 and Akcakoca-3 gas wells prior to the installation of the artificial gas lift, the company said April 8.
Initially slated to start at the end of the first quarter, the project’s delay coincided with the implementation of a new artificial lift program. The program consists primarily of velocity strings, which are cheaper and easier to install than traditional PCP pumps. Velocity strings will be used for step one of the project with a new water pump being installed in the future to prevent water loading.
Recommended Reading
Qnergy Tackles Methane Venting Emissions
2024-03-13 - Pneumatic controllers, powered by natural gas, account for a large part of the oil and gas industry’s methane emissions. Compressed air can change that, experts say.
Keeping it Tight: Diversified Energy Clamps Down on Methane Emissions
2024-04-24 - Diversified Energy wants to educate on emission reduction successes while debunking junk science.
Exclusive: Scepter CEO: Methane Emissions Detection Saves on Cost
2024-04-08 - Methane emissions detection saves on cost and "can pay for itself," Scepter CEO Phillip Father says in this Hart Energy exclusive interview.
SEC Adopts Climate Disclosure Rules in 3-2 Vote
2024-03-06 - The regulation requires companies to disclose Scope 1 and 2 emissions, weather-related risks and other climate-related data that could have a material business impact.
Majority of Recent CO2 Emissions Linked to 57 Producers - Report
2024-04-03 - The world's top three CO2-emitting companies in the period were state-owned oil firm Saudi Aramco, Russia's state-owned energy giant Gazprom and state-owned producer Coal India, the report said.