TransAtlantic Petroleum Ltd. announced management changes and provides an update of the Company's operating activities.

Chief Operating Officer Transition. TransAtlantic's Board of Directors has accepted the resignation of Gary T. Mize as the Company's President and Chief Operating Officer and subsequently appointed Mustafa Yavuz as Chief Operating Officer. Mr. Yavuz joined TransAtlantic in June 2011 in connection with the Company's acquisition of Thrace Basin Natural Gas (Turkiye) Corporation ("TBNG"). Mr. Yavuz joined TBNG in 1987 and was named TBNG's Vice President and Chief Operating Officer in 2004. He was a key contributor to TBNG's growth and efficient operations and the Board expects his leadership to provide a similar impact at TransAtlantic. Mr. Yavuz has an established understanding of the geology and operational practices and procedures in Turkey and within TransAtlantic. A native of Turkey, Mr. Yavuz grew up in the southeastern part of the country and holds a Bachelors of Science in Geological Engineering from Ankara University.

Current Production. TransAtlantic exited 2011 with a 7-day average net production rate of 5,651 net barrels of oil equivalent ("boe") per day, including approximately 18.7 million cubic feet of natural gas per day ("MMcf/d") and approximately 2,530 barrels of oil per day ("bbl/d"). The Company was not able to achieve its previous year-end production targets due to operational performance and delays that pushed some well completions and gathering system tie-ins into the first quarter of 2012.

Thrace Basin - Frac Program. TransAtlantic continues to make encouraging steps forward with its frac program in the Thrace Basin. Subsequent to previously reported results, the Company fraced five wells and achieved initial production rates averaging 2.0 MMcf/d. The table below details the Company's Thrace Basin frac results to-date, all of which were drilled on licenses held by TBNG with our partners Valeura Energy and Pinnacle Turkey Holding Company, LLC.


----------------------------------------------------------------------------
Peak Initial
Working 24-hour 7-Day
Interest Net Pay Porosity Test Rate Average
Well (%) Frac Date (meters) (%) (MMcf/d) (MMcf/d)
----------------------------------------------------------------------------
Yazir-2, 1st stage 41.5% 7/18/2011 27 8.5 0.1 0.1
----------------------------------------------------------------------------
Yazir-2, 2nd stage 41.5% 8/1/2011 46 10 - -
----------------------------------------------------------------------------
Kayi-15 41.5% 9/30/2011 20 17 0.6 0.5
----------------------------------------------------------------------------
BTD-2 41.5% 10/3/2011 9 16 4.3 3.3
----------------------------------------------------------------------------
Aydede-2 41.5% 11/22/2011 4 20 2.2 1.4
----------------------------------------------------------------------------
DTD-7 41.5% 11/28/2011 9 14 0.2 0.1
----------------------------------------------------------------------------
Kayi-14 41.5% 12/7/2011 13 17 5.0 3.7
----------------------------------------------------------------------------
Dogu Yagci-1 41.5% 12/12/2011 10 14 2.0 1.5
----------------------------------------------------------------------------
Aydede-1 41.5% 12/14/2011 10 15 0.9 0.7
----------------------------------------------------------------------------

Mr. Mitchell said, "We are very encouraged with our recent results in the Thrace Basin. While still early in the program, we believe we are making progress in unlocking a natural gas resource play with meaningful running room for both production and reserve growth. To date we have tested structures in just two of our Thrace Basin licenses, and have identified approximately 38,500 acres that we believe have the right structure and depositional factors in place to support a successful resource development program. We intend to continue testing structures across our entire Thrace Basin acreage position and are optimistic that we can increase our drilling inventory as we climb the learning curve. It is also important to note that we have only performed single-stage stimulations. We expect the stacked pays of the Thrace Basin to support multi-stage completions, which we expect to commence testing during the first quarter of 2012. We also expect to test the blanket Mezardere sands off-structure which, if successful, could add more of our approximately 800,000 net acres in the Thrace Basin to our future unconventional drilling portfolio."

Thrace Basin - Deep. TransAtlantic is currently preparing the Pancarkoy-1 exploration well (100% working interest) for stimulation. The Pancarkoy-1 well is the Company's first test of the deep, unconventional natural gas opportunities in the Thrace Basin.

TransAtlantic is currently drilling the Suleymaniye-2 exploration well (41.5% working interest), an approximately 7,900 foot well targeting the Osmancik and Mezardere formations on a license southwest of the Pancarkoy-1 well. The Suleymaniye-2 is targeting a four-way structural high to a previously drilled well that generated natural gas shows in the targeted interval.

Thrace Basin - Shallow. The Company recently placed the Yenibag-1 well (50% working interest) on production at an initial gross rate of 2.6 MMcf/d. A second shallow well, the Kumdere-1 (50% working interest), is awaiting tie-in to a sales line which is now expected to occur during the first quarter of 2012. TransAtlantic recently drilled the Meneske-1, a 4,800 foot well targeting the Danismen and Osmancik formations offsetting an existing producing well. The well encountered 4.5 meters of conventional pay and 15.5 meters of unconventional pay.

Bulgaria. The Peshtene R-11 exploration well reached total depth in late November 2011. TransAtlantic and its partner, LNG Energy, were encouraged by gas shows while drilling. More than 900 feet of core was collected and is currently under evaluation. Well completion is not expected until the first or second quarter of 2012 following results of the core review and moving a completion and stimulation crew into the area.

In addition to the Peshtene well, TransAtlantic has set surface casing on the Deventci R-2 well and intends to complete the well later this year.

Viking Sale Update. TransAtlantic's special committee of independent directors has completed the initial marketing of the Company's oilfield services businesses, Viking International and Viking Geophysical. The special committee and its advisor, Parks Paton Hoepfl & Brown, LLC ("PPHB"), are currently engaged in due diligence activities and negotiations with a multiple interested parties, including a group affiliated with Mr. Mitchell. Binding bids and a financial close are expected before the end of the first quarter of 2012.