With challenges to construction of the Dakota Access Pipeline for the most part overcome, financial pieces are falling into place for the project which, along with the Energy Transfer Crude Oil Pipeline, is known as the Bakken Pipeline System.
- Financing: Energy Transfer Partners LP (NYSE: ETP) and Sunoco Logistics Partners LP (NYSE: SXL) completed about $3.4 billion of committed debt and equity transactions, including financing for the system.
- Partner: MPLX LP (NYSE: MPLX) closed on its previously announced transaction to acquire a 36.75% indirect equity interest in the Bakken Pipeline system from Energy Transfer Partners and Sunoco Logistics Partners. The $2 billion deal, through a joint venture (JV) with Enbridge Energy Partners LP (NYSE: EEP), entails MPLX contributing $500 million. MPLX holds, through a subsidiary, a 25% interest in the JV, which equates to an approximate 9.2% indirect equity interest in the Bakken Pipeline system.
- Deal complete: Enbridge Inc. (ENB) and Enbridge Energy Partners LP (EEP) completed their transaction to acquire an effective 27.6% interest in the system.
The system connects the Bakken Shale formation in North Dakota to eastern PADD II and the U.S. Gulf Coast. Construction is about 95% complete, although Native American tribes filed suit in U.S. District Court in Washington on Feb. 14, asking a judge to find that the U.S. Army Corps of Engineers violated the National Environmental Policy Act and Clean Water Act when it recently granted the last permit needed for the project to be finished.
“The project is expected to provide attractive risk-adjusted returns and is underpinned by a significant level of take-or-pay contracts with high credit quality counterparties,” said Guy Jarvis, Enbridge president, liquids pipelines and major projects, in a statement. “It is expected to be immediately accretive to earnings and ACFFO per share, and we’re pleased to be moving forward with this project.”
Jarvis added that the company anticipates the potential for future low-cost expansions in the system.
In the short term, Enbridge will fund the deal with a $1.5 billion bridge loan to EEP through a subsidiary. The loan will remain in place until a joint funding arrangement with the MLP is finalized, likely during the second quarter. Ultimately, Enbridge could fund up to 75% of the deal, which the company said has been factored into its financing plans.
Joseph Markman can be reached at jmarkman@hartenergy.com and @JHMarkman.
Recommended Reading
Santos’ Pikka Phase 1 in Alaska to Deliver First Oil by 2026
2024-04-18 - Australia's Santos expects first oil to flow from the 80,000 bbl/d Pikka Phase 1 project in Alaska by 2026, diversifying Santos' portfolio and reducing geographic concentration risk.
Iraq to Seek Bids for Oil, Gas Contracts April 27
2024-04-18 - Iraq will auction 30 new oil and gas projects in two licensing rounds distributed across the country.
Vår Energi Hits Oil with Ringhorne North
2024-04-17 - Vår Energi’s North Sea discovery de-risks drilling prospects in the area and could be tied back to Balder area infrastructure.
Tethys Oil Releases March Production Results
2024-04-17 - Tethys Oil said the official selling price of its Oman Export Blend oil was $78.75/bbl.
Exxon Mobil Guyana Awards Two Contracts for its Whiptail Project
2024-04-16 - Exxon Mobil Guyana awarded Strohm and TechnipFMC with contracts for its Whiptail Project located offshore in Guyana’s Stabroek Block.